2014-6003 Thunder Bay, Hwy 61 2014/2015 Highway 61, from the US/Canada border, northerly. Reconstruction included grading, drainage, granular base and hot mix paving totaling 20.6 km, as well as structural work required for the Cloud Bay River structure. ($9.7 million) Advertisement Share this:TwitterFacebookLike this:Like Loading...